We will upgrade our connection to ERA-IX Frankfurt with an additional 100G of capacity to further strengthen DDoS resilience, particularly toward larger member networks. During the maintenance window, our ERA-IX Frankfurt peering sessions will be temporarily drained.
Posted Feb 25, 2026 - 01:19 UTC
This scheduled maintenance affects: Network Infrastructure (Upstream Carrier).